Experimental Advanced Superconducting Tokamak (EAST, internal designation HT-7U) is an experimental
superconducting tokamak magnetic fusion energy reactor in
Hefei, the capital city of
Anhui Province, in eastern
China. The experiment is being conducted by the Hefei-based
Institute of Plasma Physics under the
Chinese Academy of Sciences. The project was proposed in 1996 and approved in 1998. According to a 2003 schedule, buildings and site facilities were to be constructed by 2003, and tokamak assembly to take place from 2003 through 2005.
Construction was completed in March 2006 and on
September 28,
2006, "first plasma" was achieved.
In February 2007 the reactor sustained an electrical current of 250 kA for five seconds.
The reactor is an improvement over China's first superconducting tokamak device, dubbed
HT-7, also built by the Institute of Plasma Physics in partnership with
Russia in the early
1990s.
According to official reports, the project's budget is a relatively small
CNY ¥300 million (approx.
USD $37 million), some 1/15 to 1/20 the cost of a comparable reactor built in other countries.
Physics objectives
China is a member of the
ITER consortium, and EAST will be a testbed for technologies proposed for the ITER project.
EAST will test:
- Superconducting NbTi poloidal field magnets, making it the first tokamak with superconducting toroidal and poloidal magnets
- Non-inductive current drive
- Pulses of up to 1000 seconds with 0.5 MA plasma current
- Schemes for controlling plasma instabilities through real-time diagnostics
- Materials for divertors and plasma facing components
- Operation with βN = 2 and H89 > 2
Tokamak parameters
| Toroidal field, Bθ |
3.5 T |
| Plasma current, IP |
0.5 MA |
| Major radius, R0 |
1.7 m |
| Minor radius, a |
0.4 m |
| Aspect ratio, R/a |
4.25 |
| Elongation, κ |
1.6 - 2 |
| Triangularity, δ |
0.6 - 0.8 |
| Ion cyclotron resonance heating (ICRH) |
3 MW |
| Lower hybrid current drive (LHCD) |
4 MW |
| Electron cyclotron resonance heating (ECRH) |
0.5 MW |
| Neutral beam injection (NBI) |
None currently |
| Pulse length |
1-1000 s |
| Configuration |
Double-null divertor Pump limiter Single null divertor |
Further Information
Get more info on 'East'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://east.totallyexplained.com">EAST Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |